Thanks everyone! It has been alot of work. We did just about everything on our own, besides the modular home. We have a full basement, hubby poured. We had to have two wells drilled, the first one dry, the second one more than 500 feet from the house site. Everything was dug and buried under ground including elec. Our garage is almost finished also.... Lots of interior work to do though. It will one day be a finished "studio" apt. or guest house.
In case I get stuck with "someone".
The septic system is truely a work of ART, thanks to our local "health dept".
The decks will wrap around the majority of the house, and will be a welcome addition instead of dust and mud.
The dogs are enjoying the added freedom they all have here.
We are also finishing up the basement steps. One day the whole basement will be finished too. Lol
At least I have my computer in my house now. And it will be located in our basement when I can get everything up to par.
It is really good to check up on everyone at chaz!
Julie.